Project : Al Sowah Island Costal Protection Works
Client : National Marine Dredging Coprp.
Construction Period:
Location: 2008 – 2009
Description : Construction of Quay wall structure of 1,450m length at an approximate existing Sea bed level -3 to -6m NADD along the Quay wall cope line. The project comprises of the supply and placing of 2,100 nos. of pre-cast blocks and in-situ concrete for cope unit. Excavation, backfilling with excavated material, supply and placing of rock foundation, rock backfilling, , anti-scour protection and geotextile.